Prysmian’s Monna Lisa Reaches Norway (Video)

Prysmian’s Monna Lisa vessel, being build by Vard, has reached Norway for final outfitting, installation of main mission equipment and trials, before becoming fully operational in 2025.The 171-meter-long cable laying vessel (CLV) arrived to Norway after travelling 4…

Leave a Reply

Your email address will not be published. Required fields are marked *